Jifar Association's first project. In a suburb 8km north of Jimma, Jiren Elementary School's primary school building was on the brink of collapse, so . The new 3- classroom structure was built by local contractor with materials sourced locally with the exception of imported structural steel rebar. The remainder of the structure is from 100% local materials, efficiently designed using a reinforced concrete column structure supported by a rock foundation, covered by a tin roof and surrounded by compacted interlocking hydraform bricks. This project is part 1 of multiple projects to come.
0.00% Raised
$ 0.00 donated of $ 12,500.00 goal
0 Donors
Campaign has ended

Jifar Association’s first project. In a suburb 8km north of Jimma, Jiren Elementary School’s primary school building was on the brink of collapse, so planning began on rebuilding the structure.

The new 3- classroom structure was built by local contractor with materials sourced locally with the exception of imported structural steel rebar. The remainder of the structure is from 100% local materials, efficiently designed using a reinforced concrete column structure supported by a rock foundation, covered by a tin roof and surrounded by compacted interlocking hydraform bricks. This project is part 1 of multiple projects to come.

About
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Etiam consectetur aliquam quam id sollicitudin. Vivamus vitae mauris quis arcu vestibulum volutpat. Et cursus justo lectus a metus. In id ligula nec lacus venenatis auctor sed sed mauris.
text widget

Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. enim ad minim veniam, quis nostr ud exercitation ullamco laboris ni si ut aliquip ex ea commodo consequ at. Duis aute irure